Tuesday 22 February 2011

Day 13 - 21st October 2010

A representative from Rainbow visits to do an investigation and survey into what is needed to do the drying out process.  The investigations using damp meters reveal that the stud wall has the highest meter reading that it is possible to get from the equipment and is in actual fact, sopping wet- as is the surrounding floor area. Given what my father in law and the plumbers said about the tile adhesive, the floorboards and the joists I am very relieved that I persevered with getting it all looked at properly.

No comments:

Post a Comment